Project Description
The scope of work for this project involves the demolition of 21 facilities including 2 launch towers, associated structures, pavement, and site restoration. Demolition and deconstruction of indicated facility structures in its entirety including building structures, launch complex structures and other industrial facilities. Demolition and deconstruction of indicated facilities included all load and non-load bearing walls, floor slabs, interior and exterior stairs, windows, exterior doors, roof systems, interior wall assemblies, floor, wall and ceiling finishes, interior door assemblies special construction and building infrastructure. Removal and disposal of hazardous construction materials includes asbestos-containing materials, lead base paint, and PCBs. Facility demolition and deconstruction work shall also include electrical equipment, fire alarm and communication systems as well as mechanical systems, where applicable.